My Never Ending 20b PPT t56 8.8 Project
Thank you Gordon
Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us
Chip U
Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us
Chip U
Besides the impeccable welding, those bends are phenomenal. A fab masterpiece. I can't imagine how much it would have cost you to get it made.
Are you planning to run cooling water to your 'gate-array'?
Are you planning to run cooling water to your 'gate-array'?
Thank you for the compliments..
Also this little nifty remote thermostat housing -16 feed /-16 out and a 1/4 NPT bypass port with a 160 thermo inside
...

Uploaded with ImageShack.us

...
Uploaded with ImageShack.us

who makes this in-line thermostat housing?
Those wastegates look insane. I haven't really got my head around the whole rotary back pressure issue but I'll take you're word for it that it is minimum. You obviously know what you're doing.
I do wonder how you are planning to fit intercooler, radiator and oil coolers at the front? Just how much space is there?
I do wonder how you are planning to fit intercooler, radiator and oil coolers at the front? Just how much space is there?
wow.
great job documenting this build the way you have, the pictures and other details are great. i've learnt heaps over the last few hours all thanks to you!
Subscribed! Looking forward to the future updates as they come.
great job documenting this build the way you have, the pictures and other details are great. i've learnt heaps over the last few hours all thanks to you!
Subscribed! Looking forward to the future updates as they come.
UPDATE....
Well boys and squirrels... I have been a busy little grass hopper..
..
Car is 90% done... Realistically 3-4 weeks and it can be done/running... Will see how my motivation will go.. as i have all parts to finish on the shelf just time is needed etc..
Turbo kit all done mounted etc,
Heat shield done etc..
Fuel air lines done
Motec m84 installed new mill spec harness build..
Enjoy








Well boys and squirrels... I have been a busy little grass hopper..
.. Car is 90% done... Realistically 3-4 weeks and it can be done/running... Will see how my motivation will go.. as i have all parts to finish on the shelf just time is needed etc..
Turbo kit all done mounted etc,
Heat shield done etc..
Fuel air lines done
Motec m84 installed new mill spec harness build..
Enjoy








Chip, your workmanship is phenomenal, there is just one detail about the engine bay that bugs the **** out of me, it is the stainless tie wire on your coils. The method you used is not the "proper" way to do it. You want to wrap the wire so it is always tightening the screw and there can be no slack in t wire. I know it is a small detail bitut I think it would be something you would want right as everything else is done perfect.
I can't wait to hear this thing run.
I can't wait to hear this thing run.
Chip, your workmanship is phenomenal, there is just one detail about the engine bay that bugs the **** out of me, it is the stainless tie wire on your coils. The method you used is not the "proper" way to do it. You want to wrap the wire so it is always tightening the screw and there can be no slack in t wire. I know it is a small detail bitut I think it would be something you would want right as everything else is done perfect.
I can't wait to hear this thing run.
I can't wait to hear this thing run.
.. will need 10 votes to have the motion go down to the wire guy and have him do it correctly
.. Thanks
Thanks will take some far pics soon..