24 hrs of LeMons
#752
Irregular Here
iTrader: (14)
5 weekends to work on the car.
Engine is in short block form only under the hood - no turbo, intake, fuel system, ecu, harness, etc. installed yet.
No seat or harness installed
Need to fit drivers side door bars on the cage
Need fuel tank installed
Need tires bought and installed
roll cage padding
need lights since its a night race
starter
drive shaft
power cut off switch
install brakes
install radiator
oil cooler lines
front bumper
intercooler and piping
all kinds of other stuff
AND
Need a steering wheel - so pretty please send the steering wheel.
Engine is in short block form only under the hood - no turbo, intake, fuel system, ecu, harness, etc. installed yet.
No seat or harness installed
Need to fit drivers side door bars on the cage
Need fuel tank installed
Need tires bought and installed
roll cage padding
need lights since its a night race
starter
drive shaft
power cut off switch
install brakes
install radiator
oil cooler lines
front bumper
intercooler and piping
all kinds of other stuff
AND
Need a steering wheel - so pretty please send the steering wheel.
#756
Red Neck Tony Stark - C2
iTrader: (1)
5 weekends to work on the car.
Engine is in short block form only under the hood - no turbo, intake, fuel system, ecu, harness, etc. installed yet.
No seat or harness installed
Need to fit drivers side door bars on the cage
Need fuel tank installed
Need tires bought and installed
roll cage padding I think I have 3 or 4 sticks of this
need lights since its a night race
starter
drive shaft
power cut off switch
install brakes
install radiator
oil cooler lines
front bumper
intercooler and piping
all kinds of other stuff
AND
Need a steering wheel - so pretty please send the steering wheel.
Engine is in short block form only under the hood - no turbo, intake, fuel system, ecu, harness, etc. installed yet.
No seat or harness installed
Need to fit drivers side door bars on the cage
Need fuel tank installed
Need tires bought and installed
roll cage padding I think I have 3 or 4 sticks of this
need lights since its a night race
starter
drive shaft
power cut off switch
install brakes
install radiator
oil cooler lines
front bumper
intercooler and piping
all kinds of other stuff
AND
Need a steering wheel - so pretty please send the steering wheel.
#759
version 2.0
iTrader: (17)
Ive got a stock Top mount intercooler for an FC in my garage as well... you can scratch that off the list. I just got a real job, so my weekends are free. If you guys would like I can try to make a trip down there one of the next few weekends, bring my goodies and help get everything together. I can weld fairly decently, and can help put the longblock and all together at least...
#768
Irregular Here
iTrader: (14)
2011 Schedule:
TEXAS & GULF
Feb 26-27, 2011: MSR Houston, Angleton TX
April 23-24, 2011: Eagles Canyon Raceway, Decatur TX
June 4-5, 2011: MSR Houston, Angleton TX
October 1-2, 2011: MSR Houston, Angleton TX
December 17-18, 2011: Texas Motor Speedway, Fort Worth TX
Anyone notice that Lousyana is missing? That sucks.
Eagles Canyon should be a lot nicer in April than the Pressure Cooker it was this summer!
June in Houston isn't any nicer but when we are suffering from heat exhaution - at least our friends at home can point and laugh!
TEXAS & GULF
Feb 26-27, 2011: MSR Houston, Angleton TX
April 23-24, 2011: Eagles Canyon Raceway, Decatur TX
June 4-5, 2011: MSR Houston, Angleton TX
October 1-2, 2011: MSR Houston, Angleton TX
December 17-18, 2011: Texas Motor Speedway, Fort Worth TX
Anyone notice that Lousyana is missing? That sucks.
Eagles Canyon should be a lot nicer in April than the Pressure Cooker it was this summer!
June in Houston isn't any nicer but when we are suffering from heat exhaution - at least our friends at home can point and laugh!
#773
Full Member
iTrader: (2)
Join Date: May 2009
Location: Alvin, TX
Posts: 119
Likes: 0
Received 0 Likes
on
0 Posts
Scott, get me a job at your warehouse and I'll move down there rofl, no joke, I've got no ****** reason to be in Waco anymore. And I swarez im a gud driva!
Anyway, I'll dig through all my **** tomorrow and see what I still have, its scarce though. I'll be roadtripping to Houston early December... My girlfriends mom lives in Sugarland I believe, and so do some of my friends. You can count on some work.
I can def. do electrical, some welding, and mechanical work fo sho.
Anyway, I'll dig through all my **** tomorrow and see what I still have, its scarce though. I'll be roadtripping to Houston early December... My girlfriends mom lives in Sugarland I believe, and so do some of my friends. You can count on some work.
I can def. do electrical, some welding, and mechanical work fo sho.
#774
Irregular Here
iTrader: (14)
SUPER SECRET SPY PHOTOS AND TEAM SENSORY ASSAULT UPDATE
Done:
Suspension / transmission / engine bolted in securely.
Finished the cage.
Mounted the seat.
Installed the shoulder harnesses.
Have the engine mostly plumbed.
Worked on the engine electrical
Installed the bumper.
Radiator in.
New fuel lines.
Wastegate ported / turbo installed.
Starter installed.
Throttle cable.
Need to do:
Install engine harness.
Mount the new tires.
Install brake pads.
Finish safety harness mounting.
Install gas tank.
Mount fire extinguisher.
Mount gauges.
Fill all fluids.
Shifter bushings and install.
Battery cut off switch.
Secure battery.
Install engine harness.
Probably lots of other stuff.
Start the car.
Peel out / cut donuts / general ***-clownery.
Two and a half weeks to work??? Not looking tooooo good. Right on schedule tho!
Done:
Suspension / transmission / engine bolted in securely.
Finished the cage.
Mounted the seat.
Installed the shoulder harnesses.
Have the engine mostly plumbed.
Worked on the engine electrical
Installed the bumper.
Radiator in.
New fuel lines.
Wastegate ported / turbo installed.
Starter installed.
Throttle cable.
Need to do:
Install engine harness.
Mount the new tires.
Install brake pads.
Finish safety harness mounting.
Install gas tank.
Mount fire extinguisher.
Mount gauges.
Fill all fluids.
Shifter bushings and install.
Battery cut off switch.
Secure battery.
Install engine harness.
Probably lots of other stuff.
Start the car.
Peel out / cut donuts / general ***-clownery.
Two and a half weeks to work??? Not looking tooooo good. Right on schedule tho!