Defined Autoworks V-mount kit is here :)
#151
FD** Fire Disaster
iTrader: (15)
The heat here in ohio is killing us, but we are trucking through. TIG welding is difficult with sweat going in your eyes, and no fan can be used. Otherwise we are trying to get 2-3 kits out this week, and 3 more in the two weeks after. I have a full day of tuning to do on thursday this week and tuesday next week. Otherwise I am on the v-mounts solely. Peter has been finishing up the car projects that need to go out, but starting friday he should be free.
#154
Well today went right as planned (and better) , we finished up 3 kits complete, and 80% of the other three. Some silicone couplers we ordered in (two months ago) are the incorrect size, and we need more aluminum u-bends for the last three kits to be ready. Those last three will be going out thursday or friday. I will be sending PM's to everyone to confirm shipping address and shipping amounts, so keep your eyes peeled!
#159
Full Member
Join Date: Apr 2004
Location: Nanaimo, B.C. Canada
Posts: 71
Likes: 0
Received 0 Likes
on
0 Posts
Originally Posted by tv4184
So if one were to order one of these after you guys finish the first gb, how long would it theoretically take?
We will have to take at least a 2 week break after these are finished to catch up on the large car projects in the shop. Once another group buy starts I will just say 1-3 months to cover ourselves. This is a extremely busy time of year!
#161
Not Track Ready
iTrader: (6)
Join Date: Jul 2005
Location: Arcadia, CA
Posts: 291
Likes: 0
Received 0 Likes
on
0 Posts
Quote:
Originally Posted by tv4184
So if one were to order one of these after you guys finish the first gb, how long would it theoretically take?
We will have to take at least a 2 week break after these are finished to catch up on the large car projects in the shop. Once another group buy starts I will just say 1-3 months to cover ourselves. This is a extremely busy time of year!
Originally Posted by tv4184
So if one were to order one of these after you guys finish the first gb, how long would it theoretically take?
We will have to take at least a 2 week break after these are finished to catch up on the large car projects in the shop. Once another group buy starts I will just say 1-3 months to cover ourselves. This is a extremely busy time of year!
If I the timing of my single build can wait that long then I'll be in.
#162
Senior Member
iTrader: (7)
Join Date: Aug 2009
Location: Bakersfield,Ca
Posts: 412
Likes: 0
Received 0 Likes
on
0 Posts
I'd say just go for it. In the end it may just work it's way to being the right time.
#163
Not Track Ready
iTrader: (6)
Join Date: Jul 2005
Location: Arcadia, CA
Posts: 291
Likes: 0
Received 0 Likes
on
0 Posts
Yeah, if track season wasn't around and my turbo wasn't leaking I'd probably just wait. I'm hoping to get back up in about 2 months. Hopefully I can get this before mid september.
#170
Junior Member
Join Date: Jul 2011
Location: United States
Posts: 6
Likes: 0
Received 0 Likes
on
0 Posts
3 kits was completed on the 15th and have not been sent out or updates? Getting impatience here... Sorry but can you just have them send out already... So eager to have them in procession!!!
-AzEKnightz
-AzEKnightz
#173
Pm sent to the guys who have not received our v-mount yet. I know its a very very angry day for all of us. Will be posting a update once I get a word back, and sending PM's.
To the new group buy interest- On our side it only takes 1-3 weeks to build 5 v-mounts with the work load at the shop. Issue seems to be supplier of the intercoolers, and the koyo radiators constantly being on backorder. Last group buy we waited over 1 month to get the intercoolers, and now I found 4 of the 6 are the wrong size.
So, make a list of people for the new group buy and the moment 5 are on board we will verify from the distributers that the rads, and intercoolers are ACTUALLY available (they sugar coated it last time). We wont accept 1 penny until we see physical proof of in-stock items. IF all goes well, then we can get the next group buy finished in 4-6 weeks no problem.
To the new group buy interest- On our side it only takes 1-3 weeks to build 5 v-mounts with the work load at the shop. Issue seems to be supplier of the intercoolers, and the koyo radiators constantly being on backorder. Last group buy we waited over 1 month to get the intercoolers, and now I found 4 of the 6 are the wrong size.
So, make a list of people for the new group buy and the moment 5 are on board we will verify from the distributers that the rads, and intercoolers are ACTUALLY available (they sugar coated it last time). We wont accept 1 penny until we see physical proof of in-stock items. IF all goes well, then we can get the next group buy finished in 4-6 weeks no problem.
#174
Senior Member
iTrader: (4)
Join Date: Oct 2006
Location: SoCal
Posts: 272
Likes: 0
Received 0 Likes
on
0 Posts
I believe there already are 5 people for the next GB, if not more. =)
Is it possible for you guys to use a Fluidyne radiator rather than a Koyo?
Obviously the increase of the price will be paid. Thanks.
Is it possible for you guys to use a Fluidyne radiator rather than a Koyo?
Obviously the increase of the price will be paid. Thanks.
#175
Rotary Freak
iTrader: (24)
Pm sent to the guys who have not received our v-mount yet. I know its a very very angry day for all of us. Will be posting a update once I get a word back, and sending PM's.
To the new group buy interest- On our side it only takes 1-3 weeks to build 5 v-mounts with the work load at the shop. Issue seems to be supplier of the intercoolers, and the koyo radiators constantly being on backorder. Last group buy we waited over 1 month to get the intercoolers, and now I found 4 of the 6 are the wrong size.
So, make a list of people for the new group buy and the moment 5 are on board we will verify from the distributers that the rads, and intercoolers are ACTUALLY available (they sugar coated it last time). We wont accept 1 penny until we see physical proof of in-stock items. IF all goes well, then we can get the next group buy finished in 4-6 weeks no problem.
To the new group buy interest- On our side it only takes 1-3 weeks to build 5 v-mounts with the work load at the shop. Issue seems to be supplier of the intercoolers, and the koyo radiators constantly being on backorder. Last group buy we waited over 1 month to get the intercoolers, and now I found 4 of the 6 are the wrong size.
So, make a list of people for the new group buy and the moment 5 are on board we will verify from the distributers that the rads, and intercoolers are ACTUALLY available (they sugar coated it last time). We wont accept 1 penny until we see physical proof of in-stock items. IF all goes well, then we can get the next group buy finished in 4-6 weeks no problem.
I am the first one on the list but I havent received it yet. Just wanted to see who you have shipped it out to. Thanks!
-AzEKnightz