My Light Beige GSL-SE Restomod Build
#280
Rotary Freak
Thread Starter
iTrader: (19)
Join Date: Oct 2007
Location: Colorado Springs, CO
Posts: 2,014
Likes: 0
Received 0 Likes
on
0 Posts
Thanks.
Wheel well molding is on and door edge guard. I also waxed the car with an overspray remover. Alignment is also done.
What is left to do:
-final alignment of front panels and installation of under tray
-assemble and paint rear louvers
-wheel polish
-windshield molding install
-pinstriping
-finish install of emblems, stickers, etc (I will be doing)
-paint metal sunroof
-detail engine compartment and interior
Once the car is done with paint:
-new tires
-replace carpet (have in garage)
-driver's seat repair (sometime this year)
I'm hoping to get most of this done today.
Wheel well molding is on and door edge guard. I also waxed the car with an overspray remover. Alignment is also done.
What is left to do:
-final alignment of front panels and installation of under tray
-assemble and paint rear louvers
-wheel polish
-windshield molding install
-pinstriping
-finish install of emblems, stickers, etc (I will be doing)
-paint metal sunroof
-detail engine compartment and interior
Once the car is done with paint:
-new tires
-replace carpet (have in garage)
-driver's seat repair (sometime this year)
I'm hoping to get most of this done today.
#281
Rotary Freak
Thread Starter
iTrader: (19)
Join Date: Oct 2007
Location: Colorado Springs, CO
Posts: 2,014
Likes: 0
Received 0 Likes
on
0 Posts
Car is at my house (neighbor kid wanted to be in the pic):
The car is 99% done. I will have most of what's left done this week.
-window trim installed this week
-GSL-SE emblem installed this week
-wiper cowl is wetsanded and will be buffed this week.
-I will polish the wheels in the next few weeks.
-wax should go on this week.
-interior and engine cleaned this weekend
-under hood stickers installed this weekend
The car is 99% done. I will have most of what's left done this week.
-window trim installed this week
-GSL-SE emblem installed this week
-wiper cowl is wetsanded and will be buffed this week.
-I will polish the wheels in the next few weeks.
-wax should go on this week.
-interior and engine cleaned this weekend
-under hood stickers installed this weekend
#284
Rotary Freak
Thread Starter
iTrader: (19)
Join Date: Oct 2007
Location: Colorado Springs, CO
Posts: 2,014
Likes: 0
Received 0 Likes
on
0 Posts
Thanks everyone.
Total in paint and body work was about $3,800. material alone was about $1,800 or so.
I have about $850 in seals and emblems. $200 in junk yard parts.
So far I have an $8,500 free car. I have close to another $1000 to completely finish the car up.
-seat repair
-clear bra
-alarm
-engine bay parts plating
Total in paint and body work was about $3,800. material alone was about $1,800 or so.
I have about $850 in seals and emblems. $200 in junk yard parts.
So far I have an $8,500 free car. I have close to another $1000 to completely finish the car up.
-seat repair
-clear bra
-alarm
-engine bay parts plating
#286
Rotary Freak
Thread Starter
iTrader: (19)
Join Date: Oct 2007
Location: Colorado Springs, CO
Posts: 2,014
Likes: 0
Received 0 Likes
on
0 Posts
Thanks, I'll get some good pics of the entire car this weekend or next week. It has been raining almost every afternoon so I haven't even had a chance to give the car a good cleaning inside and out.
The interior needs the front carpet swapped (have sitting in the garage) and the driver's seat repaired. Everything else in the interior is looking great.
The interior needs the front carpet swapped (have sitting in the garage) and the driver's seat repaired. Everything else in the interior is looking great.
#288
Rotary Freak
Thread Starter
iTrader: (19)
Join Date: Oct 2007
Location: Colorado Springs, CO
Posts: 2,014
Likes: 0
Received 0 Likes
on
0 Posts
After having close to a month of a sick family, I've finally had time to make some progress.
-window trim install DONE
-GSL-SE emblem install DONE
-wiper cowl is wetsanded and will be buffed DONE
-polish the wheels STILL NEEDS TO GET DONE
-wax STILL NEEDS TO GET DONE
-interior and engine cleaning DONE
-under hood stickers install STILL NEEDS TO GET DONE
-window trim install DONE
-GSL-SE emblem install DONE
-wiper cowl is wetsanded and will be buffed DONE
-polish the wheels STILL NEEDS TO GET DONE
-wax STILL NEEDS TO GET DONE
-interior and engine cleaning DONE
-under hood stickers install STILL NEEDS TO GET DONE
#293
Moderator
iTrader: (3)
Join Date: Mar 2001
Location: https://www2.mazda.com/en/100th/
Posts: 30,844
Received 2,606 Likes
on
1,849 Posts
car looks great!
#297
Rotary Freak
Thread Starter
iTrader: (19)
Join Date: Oct 2007
Location: Colorado Springs, CO
Posts: 2,014
Likes: 0
Received 0 Likes
on
0 Posts
We got over an inch of hail. My hood, cowls, and roof are covered in little dents. The front emblem is nowhere to be found and there is a chip and crack in the bumper. I removed most of the little twigs and branches off the car before I thought to take a pic.
Some areas in Denver got a few inches of hail.
Some areas in Denver got a few inches of hail.
#299
Customizer
iTrader: (4)
Join Date: Mar 2009
Location: Chagrin Falls, OH
Posts: 333
Likes: 0
Received 0 Likes
on
0 Posts
I was there for that storm. I had just landed in Denver when it began and drove down to Garden of the Gods for the night. It was the worst blizzard I've seen in years. I don't know how you Colorado people deal with snow in May.