3rd Generation Specific (1993-2002) 1993-2002 Discussion including performance modifications and Technical Support Sections.
Sponsored by:

Pressure chamber in way installing KGparts sec rail

Thread Tools
 
Search this Thread
 
Old 11-25-07, 04:03 PM
  #1  
Rotary Enthusiast

Thread Starter
iTrader: (8)
 
13BNUT's Avatar
 
Join Date: Nov 2004
Location: Long Beach, CA
Posts: 1,020
Likes: 0
Received 0 Likes on 0 Posts
Pressure chamber in way installing KGparts sec rail

For those still running twins on your FD with aftermarket sec rail, FPR,and gauge. These things should mount where the pressure chamber is located, I tried searching but no luck. What did you guys do about this. post pics if possible
Old 11-25-07, 07:15 PM
  #2  
Rotary Enthusiast

Thread Starter
iTrader: (8)
 
13BNUT's Avatar
 
Join Date: Nov 2004
Location: Long Beach, CA
Posts: 1,020
Likes: 0
Received 0 Likes on 0 Posts
^^^^^
anyone I know plenty of guys have done this please chime in.
Old 11-25-07, 07:22 PM
  #3  
Original Gangster/Rotary!


iTrader: (213)
 
GoodfellaFD3S's Avatar
 
Join Date: Mar 2001
Location: FL-->NJ/NYC again!
Posts: 30,525
Received 538 Likes on 325 Posts
You can mount the FPR and gauge elsewhere, like near the driver's side shock tower.

My good friend had 1680cc sec's with seq BNRs, so it can be done. The big problem is the ACV with the rail, but who the hell wants to run an airpump anyway ?
Old 11-25-07, 11:00 PM
  #4  
Rotary Enthusiast

Thread Starter
iTrader: (8)
 
13BNUT's Avatar
 
Join Date: Nov 2004
Location: Long Beach, CA
Posts: 1,020
Likes: 0
Received 0 Likes on 0 Posts
Forgot to mention but I already removed the airpump so that will not be a problem, where exactly is the ACV located? I guess I can just block this off right? The problem with relocating the FPR and gauge is that I ordered a KGparts kit and I will not have sufficient fuel hose to reach shock tower. Any other suggestions. Is the pressure chamber absolutely necessary can I just block off the vaccum nipples?
Old 11-26-07, 05:06 AM
  #5  
Moderator

iTrader: (7)
 
dgeesaman's Avatar
 
Join Date: May 2002
Location: Fort Kickass
Posts: 12,302
Received 16 Likes on 15 Posts
Originally Posted by 13BNUT
Is the pressure chamber absolutely necessary can I just block off the vaccum nipples?
Only if you like to get full boost above 4500rpm.

with the airpump out of the way, you should have room somewhere to put the pressure chamber.
Old 11-26-07, 05:11 AM
  #6  
Lives on the Forum

 
rxrotary2_7's Avatar
 
Join Date: May 2001
Location: southern NJ
Posts: 5,097
Received 1 Like on 1 Post
Originally Posted by 13BNUT
The problem with relocating the FPR and gauge is that I ordered a KGparts kit and I will not have sufficient fuel hose to reach shock tower. Any other suggestions.
dont worry, you have enough, I took care of it before it was shipped.
Old 11-26-07, 05:28 PM
  #7  
Rotary Enthusiast

Thread Starter
iTrader: (8)
 
13BNUT's Avatar
 
Join Date: Nov 2004
Location: Long Beach, CA
Posts: 1,020
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by rxrotary2_7
dont worry, you have enough, I took care of it before it was shipped.
thanks a bunch bro, I really appreciate all your help, I will try and remove my primary rail this week and ship it to you.
-William
Old 11-26-07, 05:29 PM
  #8  
Rotary Enthusiast

Thread Starter
iTrader: (8)
 
13BNUT's Avatar
 
Join Date: Nov 2004
Location: Long Beach, CA
Posts: 1,020
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by dgeesaman
Only if you like to get full boost above 4500rpm.

with the airpump out of the way, you should have room somewhere to put the pressure chamber.
yeah that is where I was planning on relocating it.
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
astrum
2nd Generation Specific (1986-1992)
24
11-15-17 08:44 AM
86glxNA
New Member RX-7 Technical
7
08-22-15 08:54 PM
gabescanlon
Interior / Exterior / Audio
1
08-11-15 05:59 PM



Quick Reply: Pressure chamber in way installing KGparts sec rail



All times are GMT -5. The time now is 02:45 AM.