3rd Generation Specific (1993-2002) 1993-2002 Discussion including performance modifications and Technical Support Sections.
Sponsored by:

ppf removed,needs new locations for exhaust hangers

Thread Tools
 
Search this Thread
 
Old Mar 19, 2022 | 12:44 AM
  #1  
plainandsimpo's Avatar
Thread Starter
Brrap braapp..
Tenured Member: 15 Years
Liked
 
Joined: Aug 2006
Posts: 178
Likes: 0
From: Oakland
ppf removed,needs new locations for exhaust hangers

sup fellas, like the title states ive removed my ppf due to 8.8 rear end swap .was wondering what was done to replace the 2 exhaust hangers that were on the ppf .. any pictures with specific places to weld in new hangers would be appreciated
Reply
Old Mar 20, 2022 | 06:18 PM
  #2  
cr-rex's Avatar
half ass 2 or whole ass 1
Tenured Member 10 Years
iTrader: (114)
 
Joined: Nov 2011
Posts: 3,425
Likes: 489
From: okinawa to tampa
No need to weld if you don't want to. There are a lot of different ways to approach this. The simplest method would be to add 3 m8 nutserts in a triangle shape and make a bracket. The hangers on the z32 slip in on the exhaust side and the chassis side uses a bolt. So you could make a steel L bracket, nut and bolt the chassis side of the hanger and then install the exhaust side of it like normal.

Theres a million different ways to fix this issue but I think this is the simplest method. Considering the Ford rear, I'll imagine drilling a few holes in the bottom of the car wouldn't bother you
Reply
Old Mar 21, 2022 | 06:12 PM
  #3  
Monkman33's Avatar
Goodfalla Engine Complete
Tenured Member: 20 Years
Liked
Loved
Community Favorite
iTrader: (28)
 
Joined: May 2005
Posts: 3,243
Likes: 42
From: Kennewick, Washington
Originally Posted by cr-rex
Considering the Ford rear, I'll imagine drilling a few holes in the bottom of the car wouldn't bother you
Funny thing... I don't mind gentle massaging of the bins area to clear the Ronin kit, as I can pop that all back out if needed. But drilling new holes isn't something I like to do.
Reply
Old Mar 23, 2022 | 12:02 AM
  #4  
cr-rex's Avatar
half ass 2 or whole ass 1
Tenured Member 10 Years
iTrader: (114)
 
Joined: Nov 2011
Posts: 3,425
Likes: 489
From: okinawa to tampa
Well alright then lol welding to the chassis it is
Reply
Old Mar 23, 2022 | 12:10 AM
  #5  
ZE Power MX6's Avatar
Boilermakers!
Tenured Member: 20 Years
Liked
Loved
Community Favorite
iTrader: (172)
 
Joined: Nov 2002
Posts: 3,772
Likes: 380
From: Chicago, IL
You should be able to create some hanger from the 2 tunnel brace mounting point, shouldn't be too difficult.
Reply
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
theflatlander
Naturally Aspirated Performance Forum
2
Mar 31, 2011 06:44 PM
1RevvinFC3S
2nd Generation Specific (1986-1992)
31
Nov 7, 2007 10:03 PM
fastfourward
3rd Generation Specific (1993-2002)
36
Dec 24, 2004 06:45 PM




All times are GMT -5. The time now is 09:15 AM.