2nd Generation Specific (1986-1992) 1986-1992 Discussion including performance modifications and technical support sections.
Sponsored by:

Torque Sequence for 90 NA LIM and UIM

Thread Tools
 
Search this Thread
 
Old 06-11-10, 04:19 AM
  #1  
Rotary Enthusiast

Thread Starter
iTrader: (1)
 
jdonnell's Avatar
 
Join Date: Nov 2001
Location: Cape Canaveral FL
Posts: 940
Likes: 0
Received 3 Likes on 3 Posts
Torque Sequence for 90 NA LIM and UIM

I've done this several times, but for the life of me I can't find the torque sequence for LIM and UIM installations. I thought I had a service bulletin sheet from long ago but cant find it now. Manual just calls for 14-19 ft-lbs. Anyone have the sequence of tightening?
Old 06-11-10, 09:59 AM
  #2  
Are you experienced?

iTrader: (18)
 
jjcobm's Avatar
 
Join Date: Oct 2008
Location: Illinois
Posts: 2,099
Likes: 0
Received 1 Like on 1 Post
The sequence is not critical, this is not a engine cylinder head. Just go from opposite corners then to the center tightening them snugly and then torque to spec on the second pass ...
Old 06-12-10, 06:29 AM
  #3  
Rotary Enthusiast

Thread Starter
iTrader: (1)
 
jdonnell's Avatar
 
Join Date: Nov 2001
Location: Cape Canaveral FL
Posts: 940
Likes: 0
Received 3 Likes on 3 Posts
I found it. It was an Intake Manifold service bulletin attaching the exhaust manifold sequence. I didn't need it but thought it was for the UIM. Bad memory.
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Turblown
Vendor Classifieds
12
10-17-20 03:25 PM
eplusz
General Rotary Tech Support
15
10-07-15 04:04 PM
Jetlag
3rd Generation Specific (1993-2002)
4
09-29-15 06:52 AM



Quick Reply: Torque Sequence for 90 NA LIM and UIM



All times are GMT -5. The time now is 03:37 PM.