You'll never get a consistent answer on this because our ETA's are based on the line we have for the longest wait time of an item in your order. Everyone's order is different.
For most items, we only have one mold for, and it can take anywhere from 1-2 weeks to build a part from that mold depending on complexity. Carbon items usually take 1-2 weeks.
A typical non-carbon bumper or fender takes about a week to make. If there are no lines for the item, we'll give a two week ETA. If there are 3 orders for that same item in line, and the order is 4th in line, we give about a 5-6 week ETA.
For Example:
You ordered a HybridCarbon™ Diffuser and a pair of Feed carbon sides. We actually have 3 Twill weave HybridCarbon Street Diffusers in stock, but we have 6 orders for the Feed sides. However, Feed sides is one of the rare instances where we have 2 molds going for those as those molds are not complicated to build and we have high demand for them. We feel we can complete a pair of feed sides for you in 3 weeks, hence our given 3 week ETA. Keep in mind ETA's is "estimated" time of availability. Sometimes we're a little early, sometimes we're a little late. We won't be far off.
I hope this helps.
For most items, we only have one mold for, and it can take anywhere from 1-2 weeks to build a part from that mold depending on complexity. Carbon items usually take 1-2 weeks.
A typical non-carbon bumper or fender takes about a week to make. If there are no lines for the item, we'll give a two week ETA. If there are 3 orders for that same item in line, and the order is 4th in line, we give about a 5-6 week ETA.
For Example:
You ordered a HybridCarbon™ Diffuser and a pair of Feed carbon sides. We actually have 3 Twill weave HybridCarbon Street Diffusers in stock, but we have 6 orders for the Feed sides. However, Feed sides is one of the rare instances where we have 2 molds going for those as those molds are not complicated to build and we have high demand for them. We feel we can complete a pair of feed sides for you in 3 weeks, hence our given 3 week ETA. Keep in mind ETA's is "estimated" time of availability. Sometimes we're a little early, sometimes we're a little late. We won't be far off.
I hope this helps.
The following users liked this post:
FC_DRFTR1 (06-26-20)
Thread
Thread Starter
Forum
Replies
Last Post
Heisenberg
Comments and Suggestions Archive
8
10-19-10 05:38 PM
Manntis
1st Generation Specific (1979-1985)
4
07-05-02 06:54 AM