steve kan tuning at MN APRIL @ FNR RACING
Alright guys we are now changing the tune day to May. May will be the targeted month to tune with steve. I will talk to steve about changing it to May instead. I will find out what the exact day will be and let everyone one know and then we can start sending the deposit to steve.
Im looking to get the tune day to be beginning of may that my goal for everyone but if not mid of may. something like that. I will keep you guys updated as soon as I figure it out.
Kan was in town 4-7-10 to tune a RX-8. I was with him for over 12 hours and he is ready to come to MN in the last 1/2 of May. I'd like to see a date firmed up before he takes another committment.
Is there anyway we can get a date. I'm p[lanning on upgrading my car to E85 and I need Kan to do the final tune.
Thanx
Ken
Is there anyway we can get a date. I'm p[lanning on upgrading my car to E85 and I need Kan to do the final tune.
Thanx
Ken
I talked to Steve and he needs at least two weeks notice to book a flight and at least five committed to tuning and at least five $200 deposits.
So let's pick a date and get the deposits in in the next two weeks.
Steve Kan
10011 Harmon Rd. Suite #135
Fort Worth, Tx 76177
steve@kantuning.com
Thanx,
Ken
So let's pick a date and get the deposits in in the next two weeks.
Steve Kan
10011 Harmon Rd. Suite #135
Fort Worth, Tx 76177
steve@kantuning.com
Thanx,
Ken
2. Seng AKA (Saiyan) FD3S
3. Vang AKA (rx-7na) FD3S
4. Sony FD3S
5. R. Yost AKA (driftfever)
6. Eletor FC3S
7. Yia (737V)
8. ryan1
9. LUV94RX7 if car is ready
10.
I'll drive Kan around while he's here so he does not have to rent a car.
Ken
3. Vang AKA (rx-7na) FD3S
4. Sony FD3S
5. R. Yost AKA (driftfever)
6. Eletor FC3S
7. Yia (737V)
8. ryan1
9. LUV94RX7 if car is ready
10.
I'll drive Kan around while he's here so he does not have to rent a car.
Ken
Steve needs deposites at least 2 weeks before the date before he will book his flight. We NEED to pick a date, the longer it takes the longer away the tune will be. Right now May 15-16 is the earliest date to meet the 2 week notice. Will May 22-23 work for everyone, please post asap so we can get the ball rollin.
With ten people signed up we s/b able to get at least five $200 checks sent to Kan so he has them by 4-30-2010.
As Steve gets them he can let me know and I'll udate the thread.
I'm retired so I have lots of free time.
Thanx,
Ken
As Steve gets them he can let me know and I'll udate the thread.
I'm retired so I have lots of free time.
Thanx,
Ken
don't mail the deposits to my shop. USPS won't come to me. pm me for address or paypal me to steve@kantuning.com. make sure to add $6 for paypal fee
I'd like to know who is planning on getting their down payments in on time for mid-May tuning. Please post if you do. Paypal is good as it saves time of no mail delay and Kan waiting for checks to clear.
I'm not going to upgrade to E85 unless Kan is coming to town and I need enough time to order the parts and time to install.
Thanx,
Ken
I'm not going to upgrade to E85 unless Kan is coming to town and I need enough time to order the parts and time to install.
Thanx,
Ken


