Project Angie almost ready to fire up
#1
Just cruising
Thread Starter
Join Date: Oct 2004
Location: Weirton, WV
Posts: 602
Likes: 0
Received 0 Likes
on
0 Posts
Project Angie almost ready to fire up
Well, project Angie is almost ready to fire up once again. This is the third time that I've installed the engine. The engine has been torn apart since last Thanksgiving. Now, almost all of the major pieces have been replaced. They aren't new but they were not a part of the original engine. I replaced all 3 irons and had both of the secondarys ported by Karack . Both of the rotor housings have been replaced. The ECU was replaced with a ECU w/ RTek 1.8. When I had it disassembled this time I replaced the oil control rings, side seals, corner seals and springs. We re-worked the piping for the FMIC and added an electric fan. Here is a pic of the engine bay. It is still a little messy and dirty but I want to be sure that it will run before I tidy it up.
ash
ash
#4
Just cruising
Thread Starter
Join Date: Oct 2004
Location: Weirton, WV
Posts: 602
Likes: 0
Received 0 Likes
on
0 Posts
Thread
Thread Starter
Forum
Replies
Last Post
windom
Adaptronic Engine Mgmt - AUS
4
09-11-15 04:48 AM
The1Sun
1st Generation Specific (1979-1985)
0
09-07-15 10:21 PM