RX7Club.com - Mazda RX7 Forum

RX7Club.com - Mazda RX7 Forum (https://www.rx7club.com/)
-   Group Buy & Product Dev. FD RX-7 (https://www.rx7club.com/group-buy-product-dev-fd-rx-7-269/)
-   -   Custom Solenoid Rack (https://www.rx7club.com/group-buy-product-dev-fd-rx-7-269/custom-solenoid-rack-968956/)

AzEKnightz 09-23-11 02:38 AM

1. oyvindjs -
2. RENESISFD - Deposit Received
3. schleprx7 - Deposit Received
4. twinsinside -
5. wadejg -

SakeBomb Garage 09-23-11 11:00 AM

I'm really surprised more people haven't jumped on this. Have you posted this on other rotary forums too?

-Dan

RENESISFD 09-23-11 11:15 AM

^Me too. I thought the demand would have been much greater :scratch:.





John

AzEKnightz 09-23-11 11:19 AM


Originally Posted by SBGarage (Post 10797918)
I'm really surprised more people haven't jumped on this. Have you posted this on other rotary forums too?

-Dan

Nope, I will jump on other rotary forums right now to see if I can gather more people.


Originally Posted by RENESISFD (Post 10797943)
^Me too. I thought the demand would have been much greater :scratch:.

John

Me three john!!!! There were almost 20 people under the "interested list" only 5 came through. I guess prices affect the GB quite a bit. On top of that, I am sure the people who were interested compared the prices 6 years ago to now. Which "almost" doubling the prices. What can I say?

-Eric

Scrub 09-23-11 11:25 AM


Originally Posted by AzEKnightz (Post 10797946)
.
Me three john!!!! There were almost 20 people under the "interested list" only 5 came through. I guess prices affect the GB quite a bit. On top of that, I am sure the people who were interested compared the prices 6 years ago to now. Which "almost" doubling the prices. What can I say?

-Eric

I'm sure you've noticed this, but the community is much different now then it was say five years ago. Anyone can put their name on a list, but when it comes time to pay they're nowhere to be seen.

-Dan

RENESISFD 09-23-11 11:27 AM

^Lots of window shoppers now:(.


John

AzEKnightz 09-23-11 12:13 PM


Originally Posted by Scrub (Post 10797953)
I'm sure you've noticed this, but the community is much different now then it was say five years ago. Anyone can put their name on a list, but when it comes time to pay they're nowhere to be seen.

-Dan

Yep, hence why I needed the 250 deposit due to expensive solenoids. Just went on three other rotary forums and posted there. Let's see if there are more people who are willing to pay out for this amazing system =].


Originally Posted by RENESISFD (Post 10797957)
^Lots of window shoppers now:(.


John

I know huh, right John!?

-Eric

BizarroTerl 09-23-11 04:52 PM

I was mildly interested, but I'd rather keep the rack in the stock position. I'm not really open to dealing with a reticent emissions inspector.

Sephek 09-24-11 01:39 AM

Im interested! as I have the rack out since I'm doing a lot work there, if I order now what would be your eta? I can send full payment now if it makes a difference...

Also, how are these being connected to the harness, there seems to be some variation on the methods. I would like the easiest method and I don't really feel comfortable splicing the oem harness so a pnp would be ideal for me.

ColdFeet 09-24-11 02:57 PM

2nd GB list:

1. Evopanda
2. ColdFeet
3.
4.
5.

ColdFeet 09-24-11 03:04 PM

Deposit sent.

twinsinside 09-25-11 07:17 AM

deposit sent, thanks.

AzEKnightz 09-25-11 12:00 PM


Originally Posted by Sephek (Post 10799007)
Im interested! as I have the rack out since I'm doing a lot work there, if I order now what would be your eta? I can send full payment now if it makes a difference...

Also, how are these being connected to the harness, there seems to be some variation on the methods. I would like the easiest method and I don't really feel comfortable splicing the oem harness so a pnp would be ideal for me.

If you can send in your payment (257.78 - paypal fee included, or 250 if send by gift) to x_aze04@yahoo.com then I can include you in the current GB. My ETA is approximately 3-4 weeks top!

On the for the pnp, would you like a straight wiring connection from solenoid rack? or solenoid rack > 8 pin connector > to engine harness connectors?

-Eric

AzEKnightz 09-25-11 12:04 PM

1. oyvindjs -
2. RENESISFD - Deposit Received
3. schleprx7 - Deposit Received
4. twinsinside - Deposit Received
5. wadejg -
6. ColdFeet - Deposit Received

One more deposit then we can start this GB.

Wadejg, and oyvindjs, please send in your deposit to secure yourself in the spot, otherwise I will start the GB once the 5th payment is received then you'll have to wait till the second GB. I will now send you both a PM to confirm this. Thanks!

-Eric

AzEKnightz 09-25-11 12:05 PM


Originally Posted by BizarroTerl (Post 10798457)
I was mildly interested, but I'd rather keep the rack in the stock position. I'm not really open to dealing with a reticent emissions inspector.

I dont think this will effect the emission inspector because you are just simply relocating the original system to else where to make the car run better. Unless you are deleting the rest of the emission solenoids and such, then you will "fail" emission otherwise you should be ok. You just need to let the guy know.

-Eric

GoodfellaFD3S 09-25-11 02:37 PM

I know my brother is interested in this setup, but he's been spending his car fund on lots of other needed parts right now. I'll point him in this direction for ya :icon_tup:

AzEKnightz 09-25-11 04:11 PM


Originally Posted by GoodfellaFD3S (Post 10800252)
I know my brother is interested in this setup, but he's been spending his car fund on lots of other needed parts right now. I'll point him in this direction for ya :icon_tup:

Thanks Rich!

-Eric

AzEKnightz 09-25-11 04:16 PM

Guys, I just wanted to clarify that after this initial GB. The price will go up 10% as my cost for the solenoids has gone up.

I believed I've stated in my build thread but has not mentioned it here on this GB thread. Therefore if you want to save some money, do it now rather than in the second GB and so forth.

Since I've stated this price before the price changed, I will honor the current price ONLY until I fill up the 5th spot or receive my 5th payment.( I've already received my 4th payment last night) However I will still honor the same price if you can get me the payment in by the 28th.

Basically what I am saying is I am not capping this first initial GB to 5 spots, but a minimum of 5 orders to get this going. So, if you really to jump onto this GB do it ASAP!

-Eric

Sephek 09-25-11 09:26 PM


Originally Posted by AzEKnightz (Post 10800133)
If you can send in your payment (257.78 - paypal fee included, or 250 if send by gift) to x_aze04@yahoo.com then I can include you in the current GB. My ETA is approximately 3-4 weeks top!

On the for the pnp, would you like a straight wiring connection from solenoid rack? or solenoid rack > 8 pin connector > to engine harness connectors?

-Eric

Deposit sent!
Also, for the the pnp, the latter would work for me.
When you say "straight wiring connection from the solenoid rack" do you mean just plain wires with no connectors at one end?

AzEKnightz 09-26-11 01:37 AM


Originally Posted by Sephek (Post 10800621)
Deposit sent!
Also, for the the pnp, the latter would work for me.
When you say "straight wiring connection from the solenoid rack" do you mean just plain wires with no connectors at one end?

No, that means it will be straight harness and then blade connetors to one end. So there wont be any weatherpack connectors.

However I am currently trying to make a harness for one of the member at my cost for a "PnP" with one 8 pin connector so it can be easily disconnected behind the UIM rather than removing the UIM to get access to remove the wires for testing etc.

1. oyvindjs -
2. RENESISFD - Deposit Received
3. schleprx7 - Deposit Received
4. twinsinside - Deposit Received
5. wadejg - Deposit Received
6. ColdFeet - Deposit Received
7. Sephek - Deposit Received

Looks like we are ready to lock-and-load. However, I would like to give oyvindjs a couple more days to respond to me as he is the first one to contact me regarding this GB and has been following the build thread since I started (And he is oversea), therefore please bear with me for a couple more days for him to respond so I wont have to put him on the second GB and have to raise a price on him.

Again, I thank you all for the support and patience through this process and I will try my very best to get them out within 3 week time period. However it shouldnt take long than 4 weeks after I order all parts.

Cheers!

Eric Zheng

oyvindjs 09-26-11 08:18 AM

hi folx, sorry for holding the GB up, ive been hospitalized the last few days. :(
Backproblems, musclecramps so intense that it pinched the nerves going to legs, so i lost touch/feel in em. Im up and walking again now, ill get on it when i get home, and fix the deposit.
Thanks for the patience! :)

AzEKnightz 09-26-11 10:20 AM


Originally Posted by oyvindjs (Post 10800954)
hi folx, sorry for holding the GB up, ive been hospitalized the last few days. :(
Backproblems, musclecramps so intense that it pinched the nerves going to legs, so i lost touch/feel in em. Im up and walking again now, ill get on it when i get home, and fix the deposit.
Thanks for the patience! :)

Oyvind, I am glad you came through and are ok right now. Get some rest and take good care bro!

-Eric

ColdFeet 09-26-11 11:38 AM


Originally Posted by AzEKnightz (Post 10800832)
...

However I am currently trying to make a harness for one of the member at my cost for a "PnP" with one 8 pin connector so it can be easily disconnected behind the UIM rather than removing the UIM to get access to remove the wires for testing etc.

...

Interested.

oyvindjs 09-27-11 09:42 AM

Øyvind, you have sent $250.00 USD to Eric Zheng.

We have sent a payment receipt to your email and a notification to Eric Zheng at x_aze04@yahoo.com

AzEKnightz 09-27-11 09:59 AM


Originally Posted by oyvindjs (Post 10802717)
Øyvind, you have sent $250.00 USD to Eric Zheng.

We have sent a payment receipt to your email and a notification to Eric Zheng at x_aze04@yahoo.com

Thank you Oyvind!

***GB is now OFFICIALLY started for the first round***

I will place an order on all parts today and expect them to be here by next wednesday or the monday the week after.

I will keep everyone updated every other day to make sure we are all on the same page. However, if any of u have any questions; do not hesitate to contact me.

Thank you for all your supports and patience, now let's get everything going!!!

Cheers,
Eric Zheng


All times are GMT -5. The time now is 02:22 PM.


© 2024 MH Sub I, LLC dba Internet Brands